Completed/terminated procedure

BG-RRP-4.034 - National infrastructure for storage of renewable energy (Ended)

The main objective of the investment is to enable a significant increase in the share of energy from renewable sources (wind and solar) in the energy mix and to guarantee the security, stability and readiness of the Bulgarian electricity system. The investment consists of support for the construction and commissioning of a national infrastructure of electricity storage facilities from renewable sources with at least 3000 MWh of usable energy capacity at the level of the electricity grid. The storage facilities will be distributed on the territory of Bulgaria and connected to the electricity transmission network of ESO EAD. Implementation is carried out through open and competitive tender procedures based on clear, transparent and non-discriminatory criteria for the selection of proposals. It will also contribute to the construction of smart grids, ensuring a high degree of balancing and management of grid congestion, which is necessary for the integration of electricity produced from renewable energy sources.

Application time limits

Start: 21.08.2024 09:00

Deadline: 05.12.2024 16:30

Documents for information and application

Evaluation tables

The project is funded by the “Technical Assistance” Programme 2021–2027, co-financed by the European Union through the European Regional Development Fund, under project BG16RFTA001-1.003-0001 “Digital transformation in the management of EU funds” and by the “National Recovery and Resilience Plan”, under Investment C10.I11 “Ensuring an adequate information and administrative environment for the implementation of the Recovery and Resilience Plan”.