Completed/terminated procedure

BG-RRP-8.014 - Implementation of the European Train Control System (ERTMS) of on-board equipment of zero-emission electric locomotives and zero-emission electric multiple unit trains operating on the conventional railway network of the Republic of Bulgaria (Ended)

The main objective of the project is to equip the on-board part of the zero-emission electric locomotives and zero-emission electric multiple units with the European Rail Traffic Management System (ERTMS) - the European Train Control System (ETCS) - a single European digital signalling and speed control system that ensures the interoperability of national railway systems.

The investment includes a grant for the purchase and installation of interoperable on-board ETCS equipment on 108 electric locomotives and electric multiple unit trains.

Application time limits

Start: 06.06.2023 14:00

Deadline: 31.07.2023 17:30

Documents for information and application

Evaluation tables

The project is funded by the “Technical Assistance” Programme 2021–2027, co-financed by the European Union through the European Regional Development Fund, under project BG16RFTA001-1.003-0001 “Digital transformation in the management of EU funds” and by the “National Recovery and Resilience Plan”, under Investment C10.I11 “Ensuring an adequate information and administrative environment for the implementation of the Recovery and Resilience Plan”.